Ashcourt Demolition Begin Work At Hull Royal Infirmary

Our demolition division have set out working on safely bringing down the link bridge outside Hull Royal's front entrance. As part of the new extension Ashcourt are building, the link bridge needs to be brought down to accommodate the changes.

Our demolition team quickly reasilised the link bridge had 44T of reinforced concrete floor making breaking the concrete floor by hand would not be an option in the timeframe. The team set out lifting a mini-excavator into position after cutting a hole in the link bridge roof.

With many completed projects for different NHS Trusts across the country, our demolition experts are always able to find solutions to the most technical problems.