Project Description

  • Project & Melton Depot Library Extension
  • Client & East Riding of Yorkshire Council
  • The Project involved the Design & Build of a two storey extension, to an existing ERYC facility, to house/ relocate the Councils mobile library department.
  • The works had to be constructed within a live busy council storage depot, maintaining access at all times.
  • The building was divided into two sections, Office and Storage.
  • Construction Activities involved in the Project:
    • Appointing a design team, then the coordination of the design from concept to completion.
    • The building was founded on a Reinforced Concrete Strip foundations.
    • Structural Steel Portal frame, tied into the existing building.
    • RC Concrete Floors, with the first floor cast on metal decking.
    • Externally clad with a combination of brickwork and a built up cladding system.
    • Roof similarly clad in an insulated double skinned steel cladding system.
    • Aluminium Doors and Windows
    • Full Mechanical & Electrical Design Package.
    • A combination of both Masonry and Metal Stud Internal Partitions.
    • Internal Fit out package, including kitchens, Carpets, decorations and  suspended ceilings.
    • The coordination and installation of the library racking systems.
    • New Drainage system was installed.
    • External works Package

 

  • 26 week programme, completed on time.